Used Shrinking Tunnel # 201306
| Execution | 1 lane shrinking tunnel with gas heating |
|---|---|
| Heating zone length 4.500 mm | |
| 2 heating zone | |
| Operating width max. 1000 mm | |
| Crate height max.380 mm (currently limited to 250 mm) | |
| Infeed and discharge with energy saving function | |
| Volumen current | max. 20m³/h |
| Gas connection | Rp 3/4" inner threat |
| Kind of gas | Earth gas H, Earth gas L |
| Gas pressure | 100 +/- 10 mbar |
| Extraction gas | max. 500 Nm³/h |
| Fresh air exchange | min. 2000 Nm³/h |
| Kind of current | 400 V / 50 Hz |
| Control unit | WITHOUT |
Details
Download
Download Sheet #201306Download entire machine list